Project Team
- Project Developer – Kurt Williams
- Project Manager – Chuck Aker
Project Description
- Location: Lakeside, Kentucky
- Square Footage: 46,600
- Use: Repurposing of existing facility:
- Sanctuary: to best facilitate their multi-site broadcasts
- Children’s Ministry Area
- Guaranteed Maximum Price: $4,200,000.000 (In 2024 Dollars)*
- Cost Per Square Foot: $90.00**
*Due to the unique challenges that each building site presents, the cost figures are based only on the facility design and construction. The site development costs are not included.