Clear Creek Christian School
Project Team
- Project Developer – Kurt Williams
- Project Manager – Chuck Aker
Project Description
- Location: Bloomington, IN
- Square Footage: 13,800
- Use: Classroom and Cafeteria Addition. Includes an outdoor amphitheater for worship and school events.
- GMP: $3,100,000 (in 2024 dollars)*
- Cost Per Sq. Ft.: $224.50
*Due to the unique challenges that each building site presents, the cost figures are based only on the facility design and construction. The site development costs are not included.
**Cost does not reflect owner supplied FFE (fixtures, furnishings and equipment).