317-244-7637 |  7333 W. Washington St., Suite A Indianapolis, IN 46231

Mt. Tabor Baptist Church

project description

Project Team

  • Project Developer – Kurt Williams
  • Project Manager – Bryan Crostreet

Project Description

  • Location: Lebanon, Indiana
  • Square Footage: 5,437
  • Use: Handicapped Accessibility Foyer Addition
  • Guaranteed Maximum Price: $1,400,000.00 (In 2024 Dollars)*
  • Cost Per Square Foot: $260.00**

*Due to the unique challenges that each building site presents, the cost figures are based only on the facility design and construction. The site development costs are not included.

**Cost does not reflect owner supplied FFE (fixtures, furnishings and equipment).