317-244-7637 |  7333 W. Washington St., Suite A Indianapolis, IN 46231

Lakeside Christian Church | Hebron Campus

project description

Project Team

  • Project Developer – Kurt Williams
  • Project Manager – Chuck Aker

Project Description

  • Location: Hebron, Kentucky
  • Square Footage: 37,135 s.f.
  • Use: Multi-site location.
  • The complete renovation of an existing location allows Lakeside Christian to have their third site for worship.
  • Guaranteed Maximum Price: $3,150,000.00 (In 2024 Dollars)*
  • Cost Per Square Foot: $85.00*

*Due to the unique challenges that each building site presents, the cost figures are based only on the facility design and construction. The site development costs are not included.

**Cost does not reflect owner supplied FFE (fixtures, furnishings and equipment).